December 24: As many as 35 power generation units, with a combined capacity of 9,604.52 MW, remained non-productive or had no generation at all during the first eight months (April-November) of 2014-15, a power ministry official said.
The main reasons for remaining non-productive were non-availability of gas, lesser inflows of water, no schedule from the beneficiary states due to high cost of generation for liquid and DG fuel-based station and shutdown for renovation and modernisation (R&M) work, the official said.
In order to make the power plants productive round-the-year, the government is trying to ensure better availability of fuel to the sector and R&M of existing and hydro power plants, the official added.
Following are details of power stations with “nil” generation during 2014-15 (upto November, 2014)
Sl. No. |
NAME OF THE STATION |
Generating Capacity as on 30.11.2014 (MW) |
1. |
KATGHORA TPP |
35 |
2. |
SVPL TPP |
63 |
3. |
BELA TPS |
270 |
4. |
GEPL TPP Ph-I |
120 |
5. |
MIHAN TPS |
246 |
6. |
NASIK (P) TPS |
270 |
7. |
BARAUNI TPS |
210 |
8. |
CHINAKURI TPS |
30 |
9. |
CHANDRAPUR(ASSAM) TPS |
60 |
10. |
RITHALA CCPP |
108 |
11. |
DGEN MEGA CCPP |
1200 |
12. |
ESSAR CCPP |
515 |
13. |
HAZIRA CCPP EXT |
351 |
14. |
PIPAVAV CCPP |
702 |
15. |
UNOSUGEN CCPP |
382.5 |
16. |
VATWA CCPP |
100 |
17. |
RATNAGIRI CCPP I |
740 |
18. |
RATNAGIRI CCPP II |
740 |
19. |
RATNAGIRI CCPP III |
740 |
20. |
GAUTAMI CCPP |
464 |
21. |
GMR Energy Ltd - Kakinada |
220 |
22. |
KONASEEMA CCPP |
445 |
23. |
KONDAPALLI EXTN CCPP . |
366 |
24. |
VEMAGIRI CCPP |
370 |
25. |
MAITHON GT (Liq.) |
90 |
26. |
PAMPORE GPS (Liq.) |
175 |
27. |
HALDIA GT (Liq.) |
40 |
28. |
KASBA GT (Liq.) |
40 |
29. |
LVS POWER DG |
36.8 |
30. |
BELGAUM DG |
81.3 |
31. |
YELHANKA (DG) |
127.92 |
32. |
LEIMAKHONG DG |
36 |
33. |
DAE (RAJASTHAN) |
100 |
34. |
KUTTIYADI ADDL. EXTN. |
100 |
35. |
BHAWANI BARRAGE III HPS |
30 |
|
9604.52 |