APMDC Suliyari coal upcoming auction 1,50,000 MT for MP MSME on 2nd Dec 2024 @ SBP INR 2516/- per MT

APMDC Suliyari coal upcoming auction 75,000 MT for Pan India Open on 15th Oct 2024 / 15th Nov 2024 & 16th Dec 2024 @ SBP INR 3000/- per MT

Notice regarding Bidder Demo dated 23.10.2024 from 4 P.M of BCCL Coking Coal of Washery Developer and Operator (WDO) for Dugda Coal Washery e-Auction scheduled on 16.12.2024 in Coaljunction portal

Login Register Contact Us
Welcome to Linkage e-Auctions Welcome to Coal Trading Portal Welcome to APMDC Suliyari Coal

Coal news and updates

IR provides 1,528 rakes till Sept 22 for imported coal loading

27 Sep 2013

September 27: Indian Railways (IR) had provided a total of 1,528 rakes at an average of 69.5 rakes per day for loading and transport of imported coal through various ports of the country between September 1 and 22, a senior official told ICMW.

"The highest number of 78 rakes for loading of imported coal across the country was provided on September 4 and 21 whereas the lowest number of 58 rakes was provided on September 17," the official told.

One rake carries 3,500-3,600 tons of imported coal.

"We have set an internal target of providing 70-75 rakes per day for loading and transport of imported coal through various ports during the non-peak period and expect no change in this figures even in the peak period starting from December as we do not expect major increase in arrival of imported coal during that period," the official added.

Meanwhile, the transporter provided a total of 4,371 numbers of rakes to various subsidiaries of coal between September 1 and 22 at daily average of 198.7 rakes per day.

"The higher number of 216 rakes was loaded through various subsidiaries of CIL on September 14 and the lowest ,ie, 151 rakes, were loaded on September 17," the official said, indicating the loading was affected substantially on September 17, the day on which Viswakarma Puja is celebrated throughout the country.

In addition, the loading of raw as well as washed coal from various mines of the Singareni Collieries Company Ltd (SCCL) stood at 434 during the period at an average of 19.7 rakes per day, the official said.

The following table shows company-wise total and average per day supply of rakes by Indian Railways for transport of coal during the period September 1-22, 2013:

 

Coal rakes supply by Indian Railways

Company

Total

Average rakes per day

ECL

377

17.1

BCCL

461

21

CCL

588

26.7

NCL

415

18.9

K-REWA

302

13.7

Korba

468

21.3

Washery

251

11.4

Korba Total

719

32.7

SECL Total

1021

46.4

MCL IB

492

22.4

MCL TLHR

708

32.2

IB Wash

19

0.9

Talcher Washery

31

1.4

Total MCL

1250

56.8

WCL

259

11.8

Wash WCL

 

 

Total WCL

259

11.8

NEC

 

 

Total CIL (Excluding washery)

4070

185

Total CIL (Including washery)

4371

198.7

SCCL (Wash+Raw)

434

19.7

B/EMTA

36

1.6

ICML

55

2.5

P/EMTA

98

4.5

K/EMTA

42

1.9

Imported Coal

1528

69.5

Washed Coal

301

13.7