APMDC Suliyari coal upcoming auction 1,00,000 MT for MP MSME on 1st Oct 2024 / 1st Nov 2024 & 2nd Dec 2024 @ SBP INR 2516/- per MT

APMDC Suliyari coal upcoming auction 75,000 MT for Pan India Open on 15th Oct 2024 / 15th Nov 2024 & 16th Dec 2024 @ SBP INR 3000/- per MT

Notice regarding Bidder Demo of CIL Tranche VII STEEL-Coking SUB-SECTOR of NRS Linkage e-Auction scheduled on 19.09.2024 from 12:30 P.M. to 1:30 P.M. in Coaljunction portal

Login Register Contact Us
Welcome to Linkage e-Auctions Welcome to Coal Trading Portal Welcome to APMDC Suliyari Coal

Coal news and updates

India’s December coal despatches up 7.18% m-o-m

28 Jan 2016

India’s coal despatches in the month of December 2015 stood at 57.80 million tons (mt) against 53.93 mt in November 2015, up 7.18% month-on-month, according to provisional data available with ICMW.

 

On a year-on-year basis, the despatches in December 2015 registered a growth of 4.92% from 55.09 mt recorded in the same month in 2014. The December 2015 performance, however, was considerably lower than the monthly target of 62.37 mt, the data shows.

 

Coal despatches in the first nine months (April-December) of the current fiscal (2015-16) stood at 462.56 mt, up 4.63% from 442.11 mt recorded in the same period of the previous fiscal.

 

India’s coal despatches during April-December, 2015-16 were 90.67% of the 510.13 mt target set for the period.

Of the total coal despatched during April-December, 2015, CIL’s share stood at 388.99 mt, up from 354.39 mt recorded for the same period a year ago. In the month of December 2015, CIL’s despatches stood at 48.12 mt. CIL’s despatches’ target for the month of December 2015 was 49.43 mt and the same for the first nine months of 2015-16 was 399.37 mt.

 

Coal despatches from Singareni Collieries Company Limited (SCCL) and captive blocks stood at 5.44 mt and 4.24 mt, respectively, in December 2015, against 4.74 mt and 6.41 mt achieved, respectively, in the same month last fiscal. The despatch target for the month of December 2015 was 5.11 mt for SCCL and 7.83 mt for captive blocks.

 

The country’s annual coal despatch target in 2015-16 is 699.63 mt.

The following chart provides monthly coal despatch volumes in FY16, FY15 and FY14, (in million tons):

 

Month

2015-16

2014-15

2013-14

April

51.12

49.55

47.1

May

51.7

50.56

46.58

June

49.54

47.6

45.62

July

49.01

47.74

45.53

August

48.46

46.56

41.98

September

48.19

44.29

43.27

October

52.75

48.86

43.1

November

53.93

51.51

46.92

December

57.80

54.98

51.18

January

 

54.84

53.73

February

 

52.75

49.32

March

 

58.19

55.18

Total (Apr-Nov)

462.56*

441.65

411.28

Total (Apr-Mar)

462.56

607.51

572.06

 

Figure may not match due to revision in figures of previous months of 2015-16 (and also rounding off), the details of which is not available with ICMW.