APMDC Suliyari coal upcoming auction 1,00,000 MT for MP MSME on 1st Oct 2024 / 1st Nov 2024 & 2nd Dec 2024 @ SBP INR 2516/- per MT

APMDC Suliyari coal upcoming auction 75,000 MT for Pan India Open on 15th Oct 2024 / 15th Nov 2024 & 16th Dec 2024 @ SBP INR 3000/- per MT

Notice regarding Bidder Demo of CIL Tranche VII STEEL-Coking SUB-SECTOR of NRS Linkage e-Auction scheduled on 19.09.2024 from 12:30 P.M. to 1:30 P.M. in Coaljunction portal

Login Register Contact Us
Welcome to Linkage e-Auctions Welcome to Coal Trading Portal Welcome to APMDC Suliyari Coal

Coal news and updates

Indian power sector’s capacity addition at 135 MW in April

26 May 2014

May 26: India’s power generation capacity addition in April 2014 stood at 135 MW against 5,286.01 MW recorded during the previous month, according to provisional data of the Central Electricity Authority (CEA).

With this, the total installed generation capacity of the country stood at 245,393.54 MW as on April 30, 2014 while the same was at 243,028.95 MW during the last day of the previous month, revealed the data.

In April, the capacity-addition target was nil for the thermal sector against which the achievement was 135 MW while for the hydro sector the target stood at 68.67 MW against which the achievement stood at nil. Target and achievement for the nuclear sector both stood at nil, as per the CEA data.

In March 2014, the capacity-addition target was 2,720 MW for the thermal sector against which the achievement was 4,950 MW while for the hydro sector the target stood at 68.67 MW against which the achievement stood at 336.01 MW. Target and achievement for the nuclear sector both stood at nil, as per the CEA data.

During April, in the thermal sector, capacity was added at Salora TPP, Ph-1, U#1 (135MW) in Chhattisgarh by Vandana Power Ltd.

Following is the break-up of monthly capacity addition during FY’15, FY’14, FY’13 and FY’12 (in MW):

Months

2014-15

2013-14

2012-13

2011-12

April

135

282

1760

735

May

 

1570

1070#

550

June

 

660

2376

2224

July

 

0

950

1660

August

 

921

550

1200

September

 

1365

870

786.5

October

 

530

1400

345

November

 

1635

803

2807

December

 

1765

15

1158

January

 

700

877

895

February

 

2711

2863.8

972

March

 

5286.01

7028

5482*

Total

135

17,425.01

20,562.8

18,814.5*

*As reported by CEA, the capacity for 2011-12 was increased by it to 20,501.70 MW instead of 18,814.50 MW.

# CEA had earlier reported that capacity addition in May (2012-13) was 1,070 MW, but it appears that the figures have been revised to 1,130 MW.

## As per the consolidated data provided by CEA, total capacity added during April-March, 2013 stood at 20,622.80 MW although individual month’s capacity addition figure shows the total April-March figure to be 20,562.8 MW.